Rule 66
Utilization Of House And Land Around The Construction Site Relating To Production, Transmission And Distribution Of Electricity May Be Prohibited
-
(1) If any construction work has been carried on relating to production, transmission and distribution of electricity for the purpose of Sub-section (3) of Section 33 of the Act, Government of Nepal may, by publishing a notification in the Nepal Gazette from time to time, prohibit in the utilization of the house and land at the place of construction or at the place falling within the specified distance around the construction site for
any specified purpose.
(2) No one should plant tree or construct house underneath the electric line installed for the purpose of transmission or distribution of electricity or on either side of such line within the distance as prescribed in
Schedule-12 and 13.
(1) If any construction work has been carried on relating to production, transmission and distribution of electricity for the purpose of Sub-section (3) of Section 33 of the Act, Government of Nepal may, by publishing a notification in the Nepal Gazette from time to time, prohibit in the utilization of the house and land at the place of construction or at the place falling within the specified distance around the construction site for
any specified purpose.
(2) No one should plant tree or construct house underneath the electric line installed for the purpose of transmission or distribution of electricity or on either side of such line within the distance as prescribed in
Schedule-12 and 13.